We swung by the lot today and saw some of the early work. The basic framing where the slab will go is complete and they’ve run most of the plumbing.
![Cari standing where the master bedroom will be.](https://www.chewbode.com/wp-content/uploads/2016/05/House001-1024x768.jpg)
![Standing where the property line is. We'll have a decent backyard and pool.](https://www.chewbode.com/wp-content/uploads/2016/05/House002-1024x768.jpg)
![Looking out toward the front.](https://www.chewbode.com/wp-content/uploads/2016/05/House004-1024x768.jpg)
![In the front yard, looking into the lot.](https://www.chewbode.com/wp-content/uploads/2016/05/House005-1024x768.jpg)
![The plumbing for the master bathroom sinks (foreground), master bathroom shower and tub (midground), and guest bathroom and laundry room (background).](https://www.chewbode.com/wp-content/uploads/2016/05/House003-1024x768.jpg)
We swung by the lot today and saw some of the early work. The basic framing where the slab will go is complete and they’ve run most of the plumbing.