Preparing for 2021

I’ve decided to focus on deep cleaning, organizing, and purging inventory in the studio. I’m halting all of my own projects until this is complete, with the hopes I can resume everything again on Jan 1st.

To that end, about a month ago I started planning out drawer organizers using foam core boards held together with hot glue. Yesterday, I was able to complete two of them.

Combination of foam boards and custom 3-D printed holders (left side).

There are still two more drawers in that credenza, and eight drawers in my main desk pedestals that need to be done. I hope to be able to do two drawers per week.

I also took the time to completely empty off my desk (computer monitors, charging stations, etc.) and dusted and wiped everything down. I rearranged and relocated a lot of things on the desktop to a point where I could deploy my new MOTU M2 which I’ll be using in the future for some video projects.

This lead to the DeLorean going up on top of the cupboards in it’s display case. I’ll leave it up there most of the time and only pull it down when new parts come it.

And, lastly, been keeping an eye on Tropical Storm Eta.

Tropical Storm Eta – Sunday, November 8, 2020 1:00pm EST Advisory 33A.

Movies added to library: Angel Has Fallen
Read: AARP The Magazine, October/November 2020

Leave a Reply